Projects

Completed and ongoing work across buildings, infrastructure and industrial facilities.

Aerial photograph of the Ministry of Economy tower in Baku
Completed

Administrative Building of the Ministry of Economy of the Republic of Azerbaijan

Project details

This high-rise administrative building in Baku serves the Ministry of Economy. Its design features five stacked volumes that rotate as the tower rises.

Shusha Hotel-Kongress Complex Project — original site design rendering
Completed

Shusha Hotel-Kongress Complex Project

Project details

Client: Ministry of Economy of the Republic of Azerbaijan. Consulting company: Technicon Engineers Consulting LLC. Main contractor: CCN Altyapı Yatırımları və İnşaaat Anonim. Design author: Foglie D’alloro. Start: 28 December 2021. The site lists 11,800 m², 154 rooms, four floors plus a basement, 19.7 m building height, a 360 m² conference hall, a 510 m² ballroom and ten elevators.

Aerial view of the completed Property Tower in Baku
Completed

State Committee on Property Issues of Azerbaijan Republic

Project details

Technicon oversaw two construction phases. Phase II began in February 2019.

Phase III of Shahdag Winter–Summer Tourist Complex
Completed

Phase III of Shahdag Winter–Summer Tourist Complex

Project details

Gusar region. Client: Bakı Abadlıq Xidməti LLC. Contractors: Archico, Doppelmayr (cableways) and Technoalpin (snowmaking). Start: 1 April 2021. Completion: 31 December 2021.

Phase IV of Shahdag Winter–Summer Tourism Complex
Completed

Phase IV of Shahdag Winter–Summer Tourism Complex

Project details

Gusar district. Client: Bakı Abadlıq Xidməti LLC. Contractors: Archico and Technoalpin. Start: 1 April 2022. Scope includes ski slope No. 10, drainage and snowmaking, a PS4 pump, water lines connecting technical lake No. 2, and a snow groomer garage, workshop and medical center.

Reconstruction of “Icheri Sheher” Metro Station
Completed

Reconstruction of “Icheri Sheher” Metro Station

Project details

Technicon joined A+A and an Israeli company to reconstruct the former Baksovet station. The three companies completed the works in eight months.

New Mechanical Cooling System
Completed

New Mechanical Cooling System

Project details

Work for ALKO LTD began in May 2001. Technicon reports completing the project and providing reporting, design, author’s supervision and construction supervision.

Excelsior Hotel & Spa Baku
Completed

Excelsior Hotel & Spa Baku

Project details

Technicon designed automatic fire protection systems for the hotel. The source records the use of European-manufactured materials and equipment and EU and international standards.

“Qarasu” Oil Terminal
Completed

“Qarasu” Oil Terminal

Project details

Completed in 2006 for Qarasu Operating Company. The scope covered fire protection, cooling, foam and water pumping, drainage and infrastructure.

Construction of Residential Park in “S. Alekperova” Street
Completed

Construction of Residential Park in “S. Alekperova” Street

Project details

Technicon planned and designed infrastructure systems for the residential park in central Baku for Bakuinshaat LTD.

Construction of “Kulevi” Oil Terminal
Completed

Construction of “Kulevi” Oil Terminal

Project details

Consulting covered standards review, automatic fire protection, pumping and water-foam reserves, hydraulic reporting, and cooling and foam protection for planned tanks.

Reconstruction of “Bibiheybet” Mosque
Completed

Reconstruction of “Bibiheybet” Mosque

Project details

Technicon designed retaining walls, dams and drainage to address landslide conditions and undertook landscaping and exterior improvements.

Construction of “Azaloil” Fuel Terminal
Completed

Construction of “Azaloil” Fuel Terminal

Project details

Technicon designed the infrastructure, provided author’s and technical supervision, and implemented a foam fire-extinguishing system for the tanks.